{"id":627278,"date":"2021-03-02T23:01:16","date_gmt":"2021-03-02T23:01:16","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=32436"},"modified":"2021-03-02T23:01:16","modified_gmt":"2021-03-02T23:01:16","slug":"bridgestone-builds-2-mw-solar-array-to-power-south-carolina-tire-plant","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/bridgestone-builds-2-mw-solar-array-to-power-south-carolina-tire-plant\/","title":{"rendered":"Bridgestone builds 2-MW solar array to power South Carolina tire plant"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Bridgestone Americas completed its first ground solar array, providing power directly to its manufacturing process. The new solar array is located at the company\u2019s Passenger\/Light Truck Tire Plant in Graniteville, S.C. The new installation includes approximately 8 acres of solar panels that generate 2 MW of energy while reducing 1,400<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/bridgestone-builds-2-mw-solar-array-to-power-south-carolina-tire-plant\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13203,2906,9974],"class_list":["post-627278","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/627278","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=627278"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/627278\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=627278"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=627278"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=627278"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}