{"id":627511,"date":"2021-03-03T20:30:46","date_gmt":"2021-03-03T20:30:46","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=32454"},"modified":"2021-03-03T20:30:46","modified_gmt":"2021-03-03T20:30:46","slug":"white-pine-renewables-completes-largest-floating-solar-project-in-u-s-for-healdsburg-california","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/white-pine-renewables-completes-largest-floating-solar-project-in-u-s-for-healdsburg-california\/","title":{"rendered":"White Pine Renewables completes largest floating solar project in U.S. for Healdsburg, California"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>White Pine Renewables completed the Healdsburg Floating Solar Project for the city of Healdsburg, Calif., under a 25-year power purchase agreement. At 4.78 MW(dc) and sited on ponds at the city\u2019s wastewater treatment plant, the project is the largest floating solar project completed in the United States to date. The<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/white-pine-renewables-completes-largest-floating-solar-project-in-u-s-for-healdsburg-california\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[69,57,9666],"tags":[14365,13676,2906,16202,9974,15863],"class_list":["post-627511","post","type-post","status-publish","format-standard","hentry","category-california-leed-projects","category-leed-news","category-solar-power-energy","tag-floating-solar","tag-municipal","tag-news","tag-noria-energy","tag-projects","tag-white-pine-renewables"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/627511","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=627511"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/627511\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=627511"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=627511"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=627511"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}