{"id":629354,"date":"2021-03-10T15:00:03","date_gmt":"2021-03-10T15:00:03","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=32192"},"modified":"2021-03-10T15:00:03","modified_gmt":"2021-03-10T15:00:03","slug":"the-case-for-large-scale-solar-plant-repowering-as-a-service","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/the-case-for-large-scale-solar-plant-repowering-as-a-service\/","title":{"rendered":"The case for large-scale solar plant repowering-as-a-service"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Operations and maintenance (O&amp;M) is mostly about keeping the status quo of a solar plant. Fix issues. Prevent failures. Hit benchmarks. But in a tech-driven industry, is maintaining the status quo of a decades-old legacy site the best strategy? Many plant owners and operators are facing this question as their<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/the-case-for-large-scale-solar-plant-repowering-as-a-service\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14088,4737,15367,2906,3078,16211,14268,14140],"class_list":["post-629354","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-alencon-systems","tag-featured","tag-inverters-and-ebos","tag-news","tag-om","tag-repowering","tag-sma","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/629354","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=629354"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/629354\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=629354"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=629354"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=629354"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}