{"id":631115,"date":"2021-03-16T13:00:00","date_gmt":"2021-03-16T13:00:00","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=32607"},"modified":"2021-03-16T13:00:00","modified_gmt":"2021-03-16T13:00:00","slug":"pros-choice-solar-installers-launch-petition-to-change-module-level-shutdown","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/pros-choice-solar-installers-launch-petition-to-change-module-level-shutdown\/","title":{"rendered":"Pro\u2019s Choice: Solar installers launch petition to change module-level shutdown"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Scott Carman of Paragon Solar routinely sees burned out solar module connectors. Previously a solar installer, Carman has shifted to solely doing O&amp;M work, which usually means replacing broken panels (they get a lot of hail in Colorado). Many of these jobs involve stranded systems installed by companies now out<a class=\"more-link\" href=\"https:\/\/solarbuildermag.com\/news\/pros-choice-solar-installers-launch-petition-to-fix-module-level-shutdown-issues\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[4737,16218,16220,14418,2906,4366,3000,14624,13095],"class_list":["post-631115","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-featured","tag-fix-mlsd","tag-j-box","tag-nec-2017","tag-news","tag-policy","tag-products","tag-rapid-shutdown","tag-residential-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/631115","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=631115"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/631115\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=631115"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=631115"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=631115"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}