{"id":68652,"date":"2014-12-15T16:01:13","date_gmt":"2014-12-15T16:01:13","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8512"},"modified":"2014-12-15T16:01:13","modified_gmt":"2014-12-15T16:01:13","slug":"washington-gas-energy-systems-to-evaluate-battery-storage-system-in-cedartown-ga","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/washington-gas-energy-systems-to-evaluate-battery-storage-system-in-cedartown-ga\/","title":{"rendered":"Washington Gas Energy Systems to Evaluate Battery Storage System in Cedartown, Ga."},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>WGL Holdings Inc., through its subsidiary, Washington Gas Energy Systems (WGESystems), announced an agreement with Southern Company and the Electric Power Research Institute (EPRI) to test and evaluate a battery storage system at a 1-megawatt (MW) solar array in Cedartown, Ga. The project will analyze a 1-MW\/2-MWh lithium ion battery<a href=\"http:\/\/solarbuildermag.com\/news\/south\/washington-gas-energy-systems-evaluate-battery-storage-system-cedartown-ga\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12876,9751,12877,12878,12879],"class_list":["post-68652","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-electric-power-research-institute","tag-south","tag-southern-company","tag-washington-gas-energy-systems","tag-wgl-holdings-inc"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/68652","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=68652"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/68652\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=68652"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=68652"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=68652"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}