{"id":759273,"date":"2022-11-04T19:09:53","date_gmt":"2022-11-04T19:09:53","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=42378"},"modified":"2022-11-04T19:09:53","modified_gmt":"2022-11-04T19:09:53","slug":"notable-solar-developers-trying-out-pile-less-earth-mount-solar-system","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/notable-solar-developers-trying-out-pile-less-earth-mount-solar-system\/","title":{"rendered":"Notable solar developers trying out pile-less Earth Mount Solar system"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Erthos, innovators of the of Earth Mount Solar PV concept, have 14 MW of projects under contract and a memorandum of understanding (MOU) for a single 107 MWdc project. These commitments span agreements with five of the top U.S. and global utility-scale solar developers and signal the next phase in the march to deploy Earth&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/mounting-solutions-guide\/notable-solar-developers-trying-out-pile-less-earth-mount-solar-system\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[16272,12637,2906,3000,14140],"class_list":["post-759273","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-erthos","tag-mounting-guide","tag-news","tag-products","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/759273","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=759273"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/759273\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=759273"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=759273"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=759273"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}