{"id":759275,"date":"2022-11-03T15:07:01","date_gmt":"2022-11-03T15:07:01","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=42365"},"modified":"2022-11-03T15:07:01","modified_gmt":"2022-11-03T15:07:01","slug":"check-out-one-of-missouris-largest-rooftop-solar-arrays-installed-by-energylink","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/check-out-one-of-missouris-largest-rooftop-solar-arrays-installed-by-energylink\/","title":{"rendered":"Check out one of Missouri\u2019s largest rooftop solar arrays, installed by EnergyLink"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Outdoor retailer MidwayUSA\u2018s new 300,000 sq ft headquarters in Columbia, Missouri, was outfitted with one of the largest rooftop solar arrays in the state via EnergyLink. The 1.612 MW system will both advance MidwayUSA\u2019s sustainability mission while also delivering serious economic value. The solar array is projected to save the wholesaler up to $4,500,000 in&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/check-out-one-of-missouris-largest-rooftop-solar-arrays-installed-by-energylink\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15507,13541,2906,9974],"class_list":["post-759275","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial-and-industrial","tag-mlpe","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/759275","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=759275"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/759275\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=759275"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=759275"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=759275"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}