{"id":759289,"date":"2022-11-02T15:28:23","date_gmt":"2022-11-02T15:28:23","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=42133"},"modified":"2022-11-02T15:28:23","modified_gmt":"2022-11-02T15:28:23","slug":"change-is-in-order-inaccurate-preliminary-solar-designs-cost-more-than-you-think","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/change-is-in-order-inaccurate-preliminary-solar-designs-cost-more-than-you-think\/","title":{"rendered":"Change is in order: Inaccurate preliminary solar designs cost more than you think"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>At RE+ this year, I was speaking with a tier 1 solar installation company. I thought they might want to chat about ways to solve the costs associated with overlapping software systems, or inaccurate system designs \u2014 but they didn\u2019t. Instead, they told me that they are having to scale back their sales because they&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/change-is-in-order-inaccurate-preliminary-solar-designs-cost-more-than-you-think\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[16075,4737,2906,13095,14632,12833],"class_list":["post-759289","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-eagleview","tag-featured","tag-news","tag-residential-solar","tag-sales-and-marketing","tag-software"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/759289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=759289"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/759289\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=759289"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=759289"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=759289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}