{"id":759457,"date":"2022-11-07T19:06:16","date_gmt":"2022-11-07T19:06:16","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=42414"},"modified":"2022-11-07T19:06:16","modified_gmt":"2022-11-07T19:06:16","slug":"power-forward-solar-installer-strategy-planning-in-2023-and-beyond","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/power-forward-solar-installer-strategy-planning-in-2023-and-beyond\/","title":{"rendered":"Power Forward! | Solar installer strategy planning in 2023 and beyond"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Solar installer business strategy is not one size fits all. On this Power Forward! we chat with Robert Wolff, VP of Strategy with BayWa r.e., about the questions solar leaders should ask of their business to best lay that strategic foundation. With the market potential in 2023 and beyond (as well as the ongoing supply&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/residential-solar\/power-forward-solar-installer-strategy-planning-in-2023-and-beyond\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15674,4737,2906,16281,13095],"class_list":["post-759457","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-baywa-r-e","tag-featured","tag-news","tag-power-forward","tag-residential-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/759457","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=759457"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/759457\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=759457"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=759457"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=759457"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}