{"id":761632,"date":"2022-11-17T15:51:26","date_gmt":"2022-11-17T15:51:26","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=42533"},"modified":"2022-11-17T15:51:26","modified_gmt":"2022-11-17T15:51:26","slug":"first-solar-plans-fourth-u-s-solar-module-manufacturing-location-2","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/first-solar-plans-fourth-u-s-solar-module-manufacturing-location-2\/","title":{"rendered":"First Solar plans fourth U.S. solar module manufacturing location"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>First Solar selected Lawrence County, North Alabama, as the location for its fourth U.S. photovoltaic (PV) solar module manufacturing facility. The new factory is part of a previously announced investment in scaling First Solar\u2019s American manufacturing footprint to over 10 gigawatts GWdc by 2025, and is expected to create over 700 new direct jobs in&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/first-solar-plans-fourth-u-s-solar-module-manufacturing-location\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2189,2906,3000,5863,14140],"class_list":["post-761632","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-first-solar","tag-news","tag-products","tag-pv-modules","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/761632","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=761632"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/761632\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=761632"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=761632"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=761632"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}