{"id":761669,"date":"2022-11-17T16:07:35","date_gmt":"2022-11-17T16:07:35","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=42535"},"modified":"2022-11-17T16:07:35","modified_gmt":"2022-11-17T16:07:35","slug":"u-s-based-solar-cell-manufacturing-in-the-works-via-enel-north-america","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/u-s-based-solar-cell-manufacturing-in-the-works-via-enel-north-america\/","title":{"rendered":"U.S.-based solar cell manufacturing in the works via Enel North America"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The U.S. solar PV manufacturing announcements keep rolling in \u2014 and this time solar cells are involved. Enel North America, through its affiliate 3Sun USA, LLC, says it intends to build an industrial-scale PV module production facility in the United States. The proposed facility is expected to have a minimum production capacity of 3 GW&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/pv-modules\/u-s-based-solar-cell-manufacturing-in-the-works-via-enel-north-america\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[16286,16287,2906,3000,5863],"class_list":["post-761669","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-domestic","tag-enel-north-america","tag-news","tag-products","tag-pv-modules"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/761669","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=761669"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/761669\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=761669"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=761669"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=761669"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}