{"id":764066,"date":"2022-11-28T16:23:35","date_gmt":"2022-11-28T16:23:35","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=42560"},"modified":"2022-11-28T16:23:35","modified_gmt":"2022-11-28T16:23:35","slug":"hydrite-adds-on-site-solar-array-via-kuubix-construction-group","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/hydrite-adds-on-site-solar-array-via-kuubix-construction-group\/","title":{"rendered":"Hydrite adds on-site solar array via Kuubix Construction Group"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Chemical manufacturer Hydrite completed the installation of its first on-site solar array at the company\u2019s Visalia, Calif., facility. The 126 kW solar photovoltaic system will provide roughly 16% of the location\u2019s annual electricity consumption, offsetting nearly 50 tons of CO2e emissions annually. \u201cOur investment in solar power affirms Hydrite\u2019s commitment to sustainability, which is an&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/hydrite-adds-on-site-solar-array-via-kuubix-construction-group\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15507,2906,9974],"class_list":["post-764066","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial-and-industrial","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/764066","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=764066"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/764066\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=764066"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=764066"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=764066"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}