{"id":764409,"date":"2022-11-29T19:42:49","date_gmt":"2022-11-29T19:42:49","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=42606"},"modified":"2022-11-29T19:42:49","modified_gmt":"2022-11-29T19:42:49","slug":"sma-battery-specialist-powin-sign-two-year-deal-for-2-gw-of-storage-capacity","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sma-battery-specialist-powin-sign-two-year-deal-for-2-gw-of-storage-capacity\/","title":{"rendered":"SMA, battery specialist Powin sign two-year deal for 2-GW of storage capacity"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SMA America, the US subsidiary of SMA Solar Technology AG (SMA), and US battery specialist Powin signed a two-year framework agreement for the supply of SMA system solutions for a total of 2 gigawatts of storage capacity as well as for service work. \u201cWe are looking forward to a synergistic partnership in this growth sector,\u201d&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/energy-storage\/sma-battery-specialist-powin-sign-two-year-deal-for-2-gw-of-storage-capacity\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[573,15164,2906,16292,3000,13436,6457,14140],"class_list":["post-764409","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-batteries","tag-ebos","tag-news","tag-powin","tag-products","tag-sma-america","tag-storage","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/764409","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=764409"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/764409\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=764409"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=764409"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=764409"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}