{"id":765986,"date":"2022-12-06T20:33:01","date_gmt":"2022-12-06T20:33:01","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=42689"},"modified":"2022-12-06T20:33:01","modified_gmt":"2022-12-06T20:33:01","slug":"panelclaw-completes-ul-3741-listing-that-includes-23-inverter-models","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/panelclaw-completes-ul-3741-listing-that-includes-23-inverter-models\/","title":{"rendered":"PanelClaw completes UL 3741 listing that includes 23 inverter models"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>PanelClaw, an Esdec Solar Group Company and a renowned flat-roof solar racking company, has completed the UL 3741 listing process for its flagship flat roof racking platform, clawFR, with a slew of inverter models. The UL 3741 listing is the most comprehensive flat-roof listing we\u2019ve seen so far with 23 inverter models from Chint, Sungrow,&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/mounting-solutions-guide\/panelclaw-completes-ul-3741-listing-that-includes-23-inverter-models\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15507,12637,2906,13823,3000,16297],"class_list":["post-765986","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial-and-industrial","tag-mounting-guide","tag-news","tag-panelclaw","tag-products","tag-ul-3741"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/765986","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=765986"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/765986\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=765986"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=765986"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=765986"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}