{"id":767223,"date":"2022-12-12T17:21:55","date_gmt":"2022-12-12T17:21:55","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=42738"},"modified":"2022-12-12T17:21:55","modified_gmt":"2022-12-12T17:21:55","slug":"doe-lends-2-5-billion-to-gm-lg-joint-venture-to-build-three-lithium-ion-battery-plants","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/doe-lends-2-5-billion-to-gm-lg-joint-venture-to-build-three-lithium-ion-battery-plants\/","title":{"rendered":"DOE lends $2.5 billion to GM, LG joint venture to build three lithium-ion battery plants"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The foundation of the next wave of domestic battery manufacturing is starting to take shape. American Battery Factory and FREYR Battery both recently announced gigafactories for cell production. This week, Ultium Cells, a joint venture between General Motors and LG Energy Solution, announced its plans, aided by a big federal loan. The U.S. Department of&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/doe-lends-2-5-billion-to-gm-lg-joint-venture-to-build-three-lithium-ion-battery-plants\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906],"class_list":["post-767223","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/767223","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=767223"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/767223\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=767223"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=767223"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=767223"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}