{"id":772112,"date":"2023-01-06T18:26:52","date_gmt":"2023-01-06T18:26:52","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=42978"},"modified":"2023-01-06T18:26:52","modified_gmt":"2023-01-06T18:26:52","slug":"sunpower-secures-maxeon-6-solar-panel-supply-through-2025","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sunpower-secures-maxeon-6-solar-panel-supply-through-2025\/","title":{"rendered":"SunPower secures Maxeon 6 solar panel supply through 2025"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Not sure there was any doubt in this case, but it never hurts to secure solar module supply these days: SunPower Corp. extended its supply relationship with Maxeon Solar Technologies through 2025. \u201cThis supply agreement solidifies our long-term relationship with Maxeon and further secures the supply of premium panels for our expanding customer base,\u201d said&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/sunpower-secures-maxeon-6-solar-panel-supply-through-2025\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,3000,5863,13095],"class_list":["post-772112","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-products","tag-pv-modules","tag-residential-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/772112","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=772112"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/772112\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=772112"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=772112"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=772112"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}