{"id":773074,"date":"2023-01-11T13:56:51","date_gmt":"2023-01-11T13:56:51","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=43047"},"modified":"2023-01-11T13:56:51","modified_gmt":"2023-01-11T13:56:51","slug":"national-grid-renewables-kicks-off-construction-on-south-dakotas-largest-solar-project","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/national-grid-renewables-kicks-off-construction-on-south-dakotas-largest-solar-project\/","title":{"rendered":"National Grid Renewables kicks off construction on South Dakota\u2019s largest solar project"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>National Grid Renewables has started onsite field construction at its 128 MWac Wild Springs Solar Project in Pennington County, South Dakota. Wild Springs represents the largest solar energy project yet in the state, located in the Southwest Power Pool (SPP) with a 114 MW power purchase agreement (PPA) with Basin Electric Power Cooperative. \u201cWild Springs&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/national-grid-renewables-construction-south-dakota-largest-solar-project\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[16330,2189,15985,9974,13095,2384],"class_list":["post-773074","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ames-construction","tag-first-solar","tag-national-grid-renewables","tag-projects","tag-residential-solar","tag-south-dakota"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/773074","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=773074"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/773074\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=773074"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=773074"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=773074"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}