{"id":773408,"date":"2023-01-12T18:49:00","date_gmt":"2023-01-12T18:49:00","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=43103"},"modified":"2023-01-12T18:49:00","modified_gmt":"2023-01-12T18:49:00","slug":"intersect-powers-310-mw-athos-iii-project-now-operating-in-california","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/intersect-powers-310-mw-athos-iii-project-now-operating-in-california\/","title":{"rendered":"Intersect Power\u2019s 310 MW Athos III project now operating in California"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Intersect Power LLC began operations of its Athos III solar + storage project located in\u00a0Riverside County, California, on\u00a0Dec. 22, 2022. The project (also known as\u00a0Blythe Mesa Solar II) generates 224 MWac\/310 MW of solar energy and features 448 MWh of co-located storage. The Athos III project was built by union labor, with U.S.-made solar panels,&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/intersect-powers-310-mw-athos-iii-project-now-operating-in-california\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15233,9974,13648,6457,14140],"class_list":["post-773408","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-intersect-power","tag-projects","tag-solarstorage","tag-storage","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/773408","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=773408"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/773408\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=773408"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=773408"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=773408"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}