{"id":773595,"date":"2023-01-13T18:00:41","date_gmt":"2023-01-13T18:00:41","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=43119"},"modified":"2023-01-13T18:00:41","modified_gmt":"2023-01-13T18:00:41","slug":"evlo-tapped-to-provide-bess-for-utility-scale-solar-storage-project-in-british-columbia","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/evlo-tapped-to-provide-bess-for-utility-scale-solar-storage-project-in-british-columbia\/","title":{"rendered":"EVLO tapped to provide BESS for utility-scale solar + storage project in British Columbia"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Hydro-Qu\u00e9bec subsidiary EVLO Energy Storage Inc. is providing its batter technology for the first solar + storage project in Summerland, British Columbia. The Summerland project includes a 0.4 MW solar array and four EVLO 1000 battery energy storage units, along with EVLO\u2019s proprietary EMS control system, which will provide 4 MWh of storage capacity. \u201cSummerland&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/evlo-provide-bess-utility-scale-solar-storage-british-columbia\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[1429,16339,9974,16340,14878,6457,14140,16341],"class_list":["post-773595","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-british-columbia","tag-evlo-energy-storage-inc","tag-projects","tag-skyfire-energy","tag-solar-storage","tag-storage","tag-utility-scale","tag-wildstone-construction-group"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/773595","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=773595"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/773595\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=773595"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=773595"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=773595"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}