{"id":774172,"date":"2023-01-17T16:08:02","date_gmt":"2023-01-17T16:08:02","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=43112"},"modified":"2023-01-17T16:08:02","modified_gmt":"2023-01-17T16:08:02","slug":"nec-2020-705-11-load-and-supply-side-connections","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/nec-2020-705-11-load-and-supply-side-connections\/","title":{"rendered":"NEC 2020 | 705.11 | Load and Supply Side Connections"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The National Electric Code allows for a few different ways to interconnect PV systems to utility systems. In two editions of Code Corner, Ryan Mayfield with Mayfield Renewables, explain busbar, load side interconnections in 705.12 (B)(3)(1) and (2), and then supply side connections in 705.11(C) and (D). 705.12 (B)(3)(1) The sum of 125 percent of&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/nec-2020-705-11-load-and-supply-side-connections\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15164,4737,15215,16290,15947,2906,5863],"class_list":["post-774172","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ebos","tag-featured","tag-interconnection","tag-mayfield-renewables","tag-nec-2020","tag-news","tag-pv-modules"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/774172","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=774172"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/774172\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=774172"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=774172"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=774172"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}