{"id":774235,"date":"2023-01-17T17:48:00","date_gmt":"2023-01-17T17:48:00","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=43167"},"modified":"2023-01-17T17:48:00","modified_gmt":"2023-01-17T17:48:00","slug":"sol-systems-acquires-190-mw-solar-project-in-texas-from-abei-energy","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sol-systems-acquires-190-mw-solar-project-in-texas-from-abei-energy\/","title":{"rendered":"Sol Systems acquires 190 MW solar project in Texas from ABEI Energy"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Washington, D.C.-based Sol Systems LLC has acquired a 190 MW solar development project in Uvalde County, Texas, from Madrid-based ABEI Energy. Sol Systems acquired the project as part of its expanding Infrastructure + Impact business. ABEI Energy will continue to support Sol Systems during pre-construction development. \u201cThis acquisition builds on Sol Systems\u2019 growing footprint in&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/sol-systems-acquires-190-mw-solar-project-texas-abei-energy\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[16345,6745,811,2906,12497,9974,13037],"class_list":["post-774235","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-abei-energy","tag-acquisition","tag-community-solar","tag-news","tag-project","tag-projects","tag-sol-systems"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/774235","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=774235"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/774235\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=774235"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=774235"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=774235"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}