{"id":775704,"date":"2023-01-26T14:35:46","date_gmt":"2023-01-26T14:35:46","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=43289"},"modified":"2023-01-26T14:35:46","modified_gmt":"2023-01-26T14:35:46","slug":"harrison-street-forms-40-year-partnership-for-campus-utilities-at-worcester-polytechnic-institute","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/harrison-street-forms-40-year-partnership-for-campus-utilities-at-worcester-polytechnic-institute\/","title":{"rendered":"Harrison Street forms 40-year partnership for campus utilities at Worcester Polytechnic Institute"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Investment management firm Harrison Street has entered into a long-term public-private partnership (P3) with Worcester Polytechnic Institute (WPI) in Worcester, Massachusetts, for the university\u2019s on-campus utility system. Under the terms of the 40-year deal, Harrison Street will lease, manage, operate, develop and finance the WPI\u2019s utility system, while Cogen Power Technologies will serve as the&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/harrison-street-40-year-partnership-campus-utilities-worcester-polytechnic-institute\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[16373,16374,9974,2846,14140,16375],"class_list":["post-775704","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-cogen-power-technologies","tag-harrison-street","tag-projects","tag-sustainability","tag-utility-scale","tag-worcester-polytechnic-institute-wpi"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/775704","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=775704"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/775704\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=775704"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=775704"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=775704"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}