{"id":777737,"date":"2023-02-07T18:11:36","date_gmt":"2023-02-07T18:11:36","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=43568"},"modified":"2023-02-07T18:11:36","modified_gmt":"2023-02-07T18:11:36","slug":"longroad-energy-starts-construction-on-202-mwdc-umbriel-solar-project-in-texas","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/longroad-energy-starts-construction-on-202-mwdc-umbriel-solar-project-in-texas\/","title":{"rendered":"Longroad Energy starts construction on 202 MWdc Umbriel Solar project in Texas"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Longroad Energy has begun construction of Umbriel Solar, a 202 MWdc (150 MWac) PV project located in Polk County, Texas. The project is the company\u2019s sixth greenfield renewable energy project in Texas to reach financial close and is the company\u2019s first project in the state\u2019s MISO footprint. Development of Umbriel began in 2017, and the&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/longroad-energy-starts-construction-on-umbriel-solar-project-texas\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15399,2906,9974,14140],"class_list":["post-777737","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-longroad-energy","tag-news","tag-projects","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/777737","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=777737"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/777737\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=777737"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=777737"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=777737"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}