{"id":777749,"date":"2023-02-07T19:45:06","date_gmt":"2023-02-07T19:45:06","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=43485"},"modified":"2023-02-07T19:45:06","modified_gmt":"2023-02-07T19:45:06","slug":"gaf-adds-500-kw-solar-system-to-manufacturing-facility-in-san-jose","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/gaf-adds-500-kw-solar-system-to-manufacturing-facility-in-san-jose\/","title":{"rendered":"GAF adds 500 kW solar system to manufacturing facility in San Jose"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>GAF Energy, a Standard Industries company that is leading the charge for solar-integrated roofing shingles in North America, has installed a 500 kW solar system of its own atop the company\u2019s R&amp;D and manufacturing center in San Jose. The new system will generate more than 750,000 kWh of solar energy at the 112,000 sq ft&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/gaf-adds-500-kw-solar-system-to-manufacturing-facility-in-san-jose\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15064,12637,2906,9974,5863],"class_list":["post-777749","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-gaf-energy","tag-mounting-guide","tag-news","tag-projects","tag-pv-modules"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/777749","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=777749"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/777749\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=777749"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=777749"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=777749"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}