{"id":778086,"date":"2023-02-09T15:59:19","date_gmt":"2023-02-09T15:59:19","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=43638"},"modified":"2023-02-09T15:59:19","modified_gmt":"2023-02-09T15:59:19","slug":"avantus-breaks-ground-on-110-mwac-galloway-2-solar-project-in-texas","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/avantus-breaks-ground-on-110-mwac-galloway-2-solar-project-in-texas\/","title":{"rendered":"Avantus breaks ground on 110 MWac Galloway 2 Solar Project in Texas"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Avantus is celebrating the groundbreaking and continued development of the Galloway 2 Solar Project in Concho County, Texas. Once completed, the project will serve as a dedicated 147 MWdc\/110 MWac resource for Texas\u2019 energy grid, generating enough electricity to provide power for approximately 60,000 Texans. In addition, Galloway 2 is creating more than 250 peak&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/avantus-breaks-ground-galloway-2-solar-project-in-texas\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15253,16411,13988,15507,2906,9974,14140],"class_list":["post-778086","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-8minute-solar-energy","tag-avantus","tag-ci","tag-commercial-and-industrial","tag-news","tag-projects","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/778086","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=778086"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/778086\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=778086"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=778086"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=778086"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}