{"id":786293,"date":"2023-03-23T15:19:06","date_gmt":"2023-03-23T15:19:06","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=44255"},"modified":"2023-03-23T15:19:06","modified_gmt":"2023-03-23T15:19:06","slug":"spearmint-energy-expands-bess-portfolio-with-900-mw-acquisition-in-texas","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/spearmint-energy-expands-bess-portfolio-with-900-mw-acquisition-in-texas\/","title":{"rendered":"Spearmint Energy expands BESS portfolio with 900 MW acquisition in Texas"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Spearmint Energy has acquired a 900 MW portfolio of battery energy storage solutions (BESS) assets in Texas. Collectively known as Nomadic, the acquisition marks a significant expansion of Spearmint\u2019s BESS portfolio and cements the company as the one of the largest battery energy storage developers in the state. Nomadic consists of three projects, each with&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/spearmint-energy-expands-bess-portfolio-with-900-mw-acquisition-in-texas\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[6745,573,15638,442,16224,9974,16478,6457],"class_list":["post-786293","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-acquisition","tag-batteries","tag-bess","tag-energy-storage","tag-ercot","tag-projects","tag-spearmint-energy","tag-storage"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/786293","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=786293"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/786293\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=786293"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=786293"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=786293"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}