{"id":786305,"date":"2023-03-23T17:00:51","date_gmt":"2023-03-23T17:00:51","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=44264"},"modified":"2023-03-23T17:00:51","modified_gmt":"2023-03-23T17:00:51","slug":"avangrid-inks-ppa-with-meta-to-supply-texas-operations-with-new-240-mw-solar-farm","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/avangrid-inks-ppa-with-meta-to-supply-texas-operations-with-new-240-mw-solar-farm\/","title":{"rendered":"AVANGRID inks PPA with Meta to supply Texas operations with new 240 MW solar farm"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>AVANGRID has signed a power purchase agreement (PPA) with Meta to procure renewable energy from True North, a 240 MW solar farm under development in Falls County, Texas. \u201cWith projects like True North, we continue our mission of helping the country meet its ambitious clean energy goals, while also creating quality jobs and strengthening our&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/avangrid-inks-ppa-with-meta-to-supply-texas-operations-with-new-240-mw-solar-farm\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666,81],"tags":[16465,13988,15507,16312,2906,9974],"class_list":["post-786305","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","category-texas-leed-projects","tag-avangrid-inc","tag-ci","tag-commercial-and-industrial","tag-meta","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/786305","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=786305"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/786305\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=786305"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=786305"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=786305"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}