{"id":787110,"date":"2023-03-27T17:46:54","date_gmt":"2023-03-27T17:46:54","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=44288"},"modified":"2023-03-27T17:46:54","modified_gmt":"2023-03-27T17:46:54","slug":"wartsila-eolian-complete-200-mw-standalone-energy-storage-facility-in-texas","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/wartsila-eolian-complete-200-mw-standalone-energy-storage-facility-in-texas\/","title":{"rendered":"W\u00e4rtsil\u00e4, Eolian complete 200 MW standalone energy storage facility in Texas"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The technology group W\u00e4rtsil\u00e4 has reached commercial operation date (COD) for two major interconnected energy storage systems in South Texas totaling 200 MW and owned by Eolian LP, a portfolio company of Global Infrastructure Partners. The Madero and Ignacio energy storage plants will be operated using Eolian software, enabling full participation in the Electric Reliability&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/wartsila-eolian-complete-200-mw-standalone-energy-storage-facility-in-texas\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[442,16481,16224,9974,6457,16482],"class_list":["post-787110","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-energy-storage","tag-eolian","tag-ercot","tag-projects","tag-storage","tag-wartsila"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/787110","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=787110"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/787110\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=787110"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=787110"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=787110"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}