{"id":787585,"date":"2023-03-29T19:44:28","date_gmt":"2023-03-29T19:44:28","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=44324"},"modified":"2023-03-29T19:44:28","modified_gmt":"2023-03-29T19:44:28","slug":"swift-current-energy-accelerates-construction-of-800-mw-double-black-diamond-solar-project","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/swift-current-energy-accelerates-construction-of-800-mw-double-black-diamond-solar-project\/","title":{"rendered":"Swift Current Energy accelerates construction of 800 MW Double Black Diamond solar project"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Swift Current Energy\u00a0is ramping up construction this spring for its 800 MWdc Double Black Diamond solar project in central\u00a0Illinois. The company has contracted\u00a0St. Louis-based\u00a0McCarthy Building Companies\u00a0as the engineering, procurement and construction (EPC) contractor. Swift Current has also selected First Solar to provide the solar modules for the project and Nextracker to provide the smart solar&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/swift-current-energy-accelerates-construction-double-black-diamond-solar-project\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2189,14942,2906,13010,12497,9974,16489,14140],"class_list":["post-787585","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-first-solar","tag-mccarthy-building-companies","tag-news","tag-nextracker","tag-project","tag-projects","tag-swift-current-energy","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/787585","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=787585"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/787585\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=787585"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=787585"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=787585"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}