{"id":787713,"date":"2023-03-30T15:12:10","date_gmt":"2023-03-30T15:12:10","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=44331"},"modified":"2023-03-30T15:12:10","modified_gmt":"2023-03-30T15:12:10","slug":"duke-energy-begins-operating-the-largest-battery-system-in-north-carolina","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/duke-energy-begins-operating-the-largest-battery-system-in-north-carolina\/","title":{"rendered":"Duke Energy begins operating the largest battery system in North Carolina"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Duke Energy is expanding its battery storage capabilities in North Carolina and has begun commercial operation of the state\u2019s largest battery system, an 11 MW project in Onslow County. The battery system will frequently be operated in conjunction with an adjacent 13 MW solar facility located on a leased site within U.S. Marine Corps Base&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/duke-energy-begins-operating-largest-battery-system-in-north-carolina\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[573,15638,2049,442,9974,6457],"class_list":["post-787713","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-batteries","tag-bess","tag-duke-energy","tag-energy-storage","tag-projects","tag-storage"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/787713","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=787713"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/787713\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=787713"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=787713"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=787713"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}