{"id":7892,"date":"2013-02-01T21:22:44","date_gmt":"2013-02-01T21:22:44","guid":{"rendered":"http:\/\/greenbuildingelements.com\/?p=9050"},"modified":"2013-02-01T21:22:44","modified_gmt":"2013-02-01T21:22:44","slug":"solectria-renewables-commercial-inverters-power-1-2mw-installation-in-fort-myers-florida-at-fleamasters-market","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solectria-renewables-commercial-inverters-power-1-2mw-installation-in-fort-myers-florida-at-fleamasters-market\/","title":{"rendered":"Solectria Renewables\u2019 Commercial Inverters Power 1.2MW Installation in Fort Myers, Florida at Fleamasters Market"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Solectria Renewables, LLC, a U.S. PV inverter manufacturer, announced today that SolarOne Florida, LLC chose Solectria&rsquo;s PVI 60-95KW inverters to power the 1.2MW solar PV installation at Fleamasters Market in Fort Myers, Florida.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57],"tags":[8355,2903,8356,8357,3060,3056,2906,8358,3008,8359,222,3044,8360,8361],"class_list":["post-7892","post","type-post","status-publish","format-standard","hentry","category-leed-news","tag-bob-montanaro","tag-energy","tag-fleamasters-market","tag-florida-at-fleamasters-market","tag-great-greenness","tag-green-technology","tag-news","tag-photovoltaic-inverter","tag-press-releases","tag-pvi-60-95kw-inverters","tag-renewable-energy","tag-solar","tag-solectria-renewables","tag-solectria-renewables-commercial-inverters-power-1-2mw-installation-in-fort-myers"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/7892","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=7892"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/7892\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=7892"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=7892"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=7892"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}