{"id":789555,"date":"2023-04-10T18:32:31","date_gmt":"2023-04-10T18:32:31","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=44449"},"modified":"2023-04-10T18:32:31","modified_gmt":"2023-04-10T18:32:31","slug":"teslas-solar-roof-is-way-off-initial-install-goals-according-to-wood-mackenzie-report","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/teslas-solar-roof-is-way-off-initial-install-goals-according-to-wood-mackenzie-report\/","title":{"rendered":"Tesla\u2019s Solar Roof is way off initial install goals, according to Wood Mackenzie report"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Tesla CEO Elon Musk debuted the Tesla Solar Roof to much fanfare in 2016. Tesla aimed to manufacture 1,000 Solar Roofs per week by late 2019 and subsequently announced an installation goal of 1,000 Solar Roofs per week in early 2020. Industry analysts Wood Mackenzie estimate that, since the launch of the Tesla Solar Roof&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/teslas-solar-roof-is-way-off-initial-install-goals-says-wood-mackenzie-analyst\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,3000,5863,1281],"class_list":["post-789555","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-products","tag-pv-modules","tag-tesla"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/789555","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=789555"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/789555\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=789555"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=789555"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=789555"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}