{"id":790955,"date":"2023-04-18T14:43:18","date_gmt":"2023-04-18T14:43:18","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=44593"},"modified":"2023-04-18T14:43:18","modified_gmt":"2023-04-18T14:43:18","slug":"hoymiles-innovates-microinverter-installs-with-hms-cable-system","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/hoymiles-innovates-microinverter-installs-with-hms-cable-system\/","title":{"rendered":"Hoymiles innovates microinverter installs with HMS Cable System"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Solar installers and their customers are always looking for ways to save costs and time without compromising on quality. Hoymiles is set to launch a new cable installation solution for multi-microinverter and single-microinverter PV systems that they say cuts installation time by 70 percent. Traditional setups generally require extensive manual disconnecting, stripping, and wiring. Hoymiles&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/hoymiles-innovates-microinverter-installs-with-hms-cable-system\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15164,16342,15367,12874,2906,3000,13095],"class_list":["post-790955","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ebos","tag-hoymiles","tag-inverters-and-ebos","tag-microinverters","tag-news","tag-products","tag-residential-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/790955","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=790955"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/790955\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=790955"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=790955"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=790955"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}