{"id":7916,"date":"2013-02-03T16:04:07","date_gmt":"2013-02-03T16:04:07","guid":{"rendered":"http:\/\/greenbuildingelements.com\/?p=9062"},"modified":"2013-02-03T16:04:07","modified_gmt":"2013-02-03T16:04:07","slug":"nrg-completes-66-mw-alpine-solar-photovoltaic-facility","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/nrg-completes-66-mw-alpine-solar-photovoltaic-facility\/","title":{"rendered":"NRG Completes 66 MW Alpine Solar Photovoltaic Facility"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Yesterday, NRG Energy, Inc announced the start of commercial operations for the Alpine Solar Generating Station, a 66 megawatt (AC) photovoltaic facility, currently the largest fully operational solar plant in California. The station&rsquo;s electricity will be sold to Pacific Gas &amp; Electric under a 20-year power purchase agreement.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57],"tags":[8378,8379,2903,8380,8381,2906,8382,8383,4078,3008,8384,222,8385,3044],"class_list":["post-7916","post","type-post","status-publish","format-standard","hentry","category-leed-news","tag-alpine-generating-station","tag-dennis-hunter","tag-energy","tag-fong-wan","tag-losa-angeles","tag-news","tag-nrg-completes-66-mw-alpine-solar-photovoltaic-facility","tag-nrg-solar","tag-pacific-gas-and-electric-company","tag-press-releases","tag-randy-hickok","tag-renewable-energy","tag-renewable-energy-news-in-cam-clean-energy","tag-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/7916","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=7916"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/7916\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=7916"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=7916"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=7916"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}