{"id":792381,"date":"2023-04-27T15:18:30","date_gmt":"2023-04-27T15:18:30","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=44744"},"modified":"2023-04-27T15:18:30","modified_gmt":"2023-04-27T15:18:30","slug":"solar-optimum-dsd-renewables-installs-12-mw-solar-carport-at-six-flags-magic-mountain-in-l-a","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solar-optimum-dsd-renewables-installs-12-mw-solar-carport-at-six-flags-magic-mountain-in-l-a\/","title":{"rendered":"Solar Optimum, DSD Renewables installs 12 MW solar carport at Six Flags Magic Mountain in L.A."},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Theme park operator Six Flags Entertainment Corp. has joined forces with Solar Optimum and DSD Renewables (DSD) to install a new 12.37 MW solar carport and energy storage system at Six Flags Magic Mountain in Los Angeles. The project will rank as the largest single-site commercial renewable energy project in California and largest solar project&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/solar-optimum-dsd-renewables-installs-solar-carport-six-flags-magic-mountain\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15507,16296,2906,9974,16429,14638,2846],"class_list":["post-792381","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial-and-industrial","tag-dsd-renewables","tag-news","tag-projects","tag-six-flags","tag-solar-optimum","tag-sustainability"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/792381","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=792381"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/792381\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=792381"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=792381"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=792381"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}