{"id":793072,"date":"2023-05-01T18:09:12","date_gmt":"2023-05-01T18:09:12","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=44793"},"modified":"2023-05-01T18:09:12","modified_gmt":"2023-05-01T18:09:12","slug":"dsd-black-bear-complete-1-4-mw-solar-installation-at-pleasanton-office-park-in-ca","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/dsd-black-bear-complete-1-4-mw-solar-installation-at-pleasanton-office-park-in-ca\/","title":{"rendered":"DSD, Black Bear complete 1.4 MW solar installation at Pleasanton office park in CA"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>DSD Renewables and\u00a0Black Bear Energy\u00a0have completed two onsite solar canopies, totaling 1.4 MW at Pleasanton Corporate Commons office park in California. The 957 kW and 429 kW installations will offset much of the campus\u2019 energy load and are expected to generate over 2 GWh of clean energy annually. Pleasanton Corporate Commons is managed by Hines,&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/dsd-black-bear-complete-1-4-mw-solar-installation-at-pleasanton-office-park-in-ca\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15260,15507,16296,2906,9974],"class_list":["post-793072","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-black-bear-energy","tag-commercial-and-industrial","tag-dsd-renewables","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/793072","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=793072"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/793072\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=793072"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=793072"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=793072"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}