{"id":797232,"date":"2023-05-25T15:52:10","date_gmt":"2023-05-25T15:52:10","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=45083"},"modified":"2023-05-25T15:52:10","modified_gmt":"2023-05-25T15:52:10","slug":"solar-tariff-moratorium-remains-as-house-fails-veto-override-attempt","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solar-tariff-moratorium-remains-as-house-fails-veto-override-attempt\/","title":{"rendered":"Solar tariff moratorium remains as House fails veto override attempt"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The U.S. House of Representatives came up short in its attempt to override President Joe Biden\u2019s veto of a resolution to eliminate his two-year tariff moratorium on imported solar panels. The House voted 214-205 on Wednesday, 76 shy of the 290 needed for the two-thirds majority required to override Biden\u2019s veto of H.J. Res. 39&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/policy\/solar-tariff-moratorium-remains-as-house-fails-veto-override-attempt\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15507,811,16508,5380,2906,4366,14774,14140],"class_list":["post-797232","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial-and-industrial","tag-community-solar","tag-congressional-review-act-cra","tag-manufacturing","tag-news","tag-policy","tag-tariffs","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/797232","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=797232"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/797232\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=797232"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=797232"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=797232"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}