{"id":7993,"date":"2013-02-05T19:09:01","date_gmt":"2013-02-05T19:09:01","guid":{"rendered":"http:\/\/greenbuildingelements.com\/?p=9073"},"modified":"2013-02-05T19:09:01","modified_gmt":"2013-02-05T19:09:01","slug":"biofuels-development-international-plans-to-begin-bioiesel-production-in-q3-of-2013","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/biofuels-development-international-plans-to-begin-bioiesel-production-in-q3-of-2013\/","title":{"rendered":"BioFuels Development International Plans To Begin Bioiesel Production In Q3 Of 2013"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>CB&amp;T will execute a multi-phased approach to reentry into the market, initially restarting production at a 30M gallon per year throughput rate with an expected increase to 75M gallons per year in the next 12 months. Utilizing a combination of domestic and foreign feedstock, primarily taken out of waste streams, CB&amp;T will be a feedstock agnostic supply train driven operation taking advantage of its location on Greens Bayou which connects to the Houston Ship Channel.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57],"tags":[8411,609,8412,8413,8414,8415,2903,8416,8417,2906,3008,222],"class_list":["post-7993","post","type-post","status-publish","format-standard","hentry","category-leed-news","tag-alex-h-edwards-iii","tag-alternative-fuels","tag-biodiesel-production","tag-biofuels-development-international","tag-biofuels-development-international-plans-to-begin-bioiesel-production-in-q3-of-2013","tag-cbt","tag-energy","tag-green-hunter-biofuels","tag-ken-brown","tag-news","tag-press-releases","tag-renewable-energy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/7993","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=7993"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/7993\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=7993"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=7993"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=7993"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}