{"id":799363,"date":"2023-06-06T14:16:40","date_gmt":"2023-06-06T14:16:40","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=45237"},"modified":"2023-06-06T14:16:40","modified_gmt":"2023-06-06T14:16:40","slug":"high-caliber-energy-selects-enervenue-batteries-for-large-florida-project","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/high-caliber-energy-selects-enervenue-batteries-for-large-florida-project\/","title":{"rendered":"High Caliber Energy selects EnerVenue batteries for large Florida project"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>High Caliber Energy, a Florida-based consulting and EPC firm specialized in LNG and renewables, has placed a 25 MWh order of Energy Storage Vessels (ESVs) from metal-hydrogen battery company EnerVenue. High Caliber Energy\u2019s client is an energy company based in the Southeastern United States, and the order will support a large project for residents in&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/energy-storage\/high-caliber-energy-selects-enervenue-batteries-for-large-florida-project\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[573,15650,2906,3000,9974,6457,14140],"class_list":["post-799363","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-batteries","tag-enervenue","tag-news","tag-products","tag-projects","tag-storage","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/799363","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=799363"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/799363\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=799363"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=799363"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=799363"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}