{"id":801272,"date":"2023-06-15T14:59:29","date_gmt":"2023-06-15T14:59:29","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=45374"},"modified":"2023-06-15T14:59:29","modified_gmt":"2023-06-15T14:59:29","slug":"canadian-solar-to-open-first-u-s-based-solar-module-manufacturing-facility","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/canadian-solar-to-open-first-u-s-based-solar-module-manufacturing-facility\/","title":{"rendered":"Canadian Solar to open first U.S.-based solar module manufacturing facility"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>One of the only top, global solar module brands to not have a U.S.-based production facility in the works, Canadian Solar Inc., is ready to change that. The Ontario-based company has plans to establish a 5-GW solar PV module production facility in Mesquite, Texas. That 5 GW capacity is the equivalent to approximately 20,000 high-power&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/canadian-solar-to-open-first-u-s-based-solar-module-manufacturing-facility\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12961,2906,3000,5863],"class_list":["post-801272","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-canadian-solar","tag-news","tag-products","tag-pv-modules"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/801272","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=801272"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/801272\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=801272"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=801272"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=801272"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}