{"id":801474,"date":"2023-06-16T17:54:01","date_gmt":"2023-06-16T17:54:01","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=45411"},"modified":"2023-06-16T17:54:01","modified_gmt":"2023-06-16T17:54:01","slug":"truliant-adds-742-panel-rooftop-solar-system-at-n-c-operations-center","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/truliant-adds-742-panel-rooftop-solar-system-at-n-c-operations-center\/","title":{"rendered":"Truliant adds 742-panel rooftop solar system at N.C. operations center"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Truliant Federal Credit Union has completed a 742-panel solar installation on the roof of its new Hanes Mall Operations Center in Winston-Salem, North Carolina. Truliant recently finished converting the former three-story Macy\u2019s store at Hanes Mall into an operations center for the credit union. The projected used 51,000 square feet of rooftop space \u2014 about&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/truliant-adds-742-panel-rooftop-solar-system\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15507,2906,9974,16581,565],"class_list":["post-801474","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial-and-industrial","tag-news","tag-projects","tag-renu-energy-solutions","tag-rooftop-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/801474","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=801474"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/801474\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=801474"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=801474"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=801474"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}