{"id":80386,"date":"2015-01-23T16:14:10","date_gmt":"2015-01-23T16:14:10","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8642"},"modified":"2015-01-23T16:14:10","modified_gmt":"2015-01-23T16:14:10","slug":"nexamp-flips-the-switch-on-4-4-megawatt-solar-installation","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/nexamp-flips-the-switch-on-4-4-megawatt-solar-installation\/","title":{"rendered":"NEXAMP Flips The Switch On 4.4 Megawatt Solar Installation"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>&nbsp;Nexamp, a leading provider of solar energy, today announced the completion of a 4.4 MW solar project in Charlton, Massachusetts. The project, which achieved commercial operations at the end of December, marked the 21st megawatt of solar power commissioned by the company in the Commonwealth in 2014. Among the many<a href=\"http:\/\/solarbuildermag.com\/news\/nexamp-flips-switch-4-4-megawatt-solar-installation\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906],"class_list":["post-80386","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/80386","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=80386"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/80386\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=80386"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=80386"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=80386"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}