{"id":804043,"date":"2023-06-27T15:59:19","date_gmt":"2023-06-27T15:59:19","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=45542"},"modified":"2023-06-27T15:59:19","modified_gmt":"2023-06-27T15:59:19","slug":"minnesota-power-cuts-the-ribbon-on-largest-regional-solar-project","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/minnesota-power-cuts-the-ribbon-on-largest-regional-solar-project\/","title":{"rendered":"Minnesota Power cuts the ribbon on largest regional solar project\u00a0"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Minnesota Power celebrated a renewable solar energy milestone last week with a ribbon-cutting at its recently completed Sylvan Solar Project near Brainerd, Minnesota. The project is the last \u2014 and by far the largest at about 80 acres and 15.2 MW \u2014 of three projects totaling more than 20 MW meant to boost the region\u2019s&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/minnesota-power-cuts-the-ribbon-on-largest-regional-solar-project\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[16534,827,2906,9974,14140],"class_list":["post-804043","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-heliene","tag-minnesota-power","tag-news","tag-projects","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/804043","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=804043"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/804043\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=804043"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=804043"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=804043"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}