{"id":807594,"date":"2023-07-11T14:09:44","date_gmt":"2023-07-11T14:09:44","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=45722"},"modified":"2023-07-11T14:09:44","modified_gmt":"2023-07-11T14:09:44","slug":"d-e-shaw-begins-construction-on-200-mwac-san-juan-solarstorage-project-in-n-m","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/d-e-shaw-begins-construction-on-200-mwac-san-juan-solarstorage-project-in-n-m\/","title":{"rendered":"D.E.\u00a0Shaw begins construction on 200 MWac San Juan solar+storage project in N.M."},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>D.E. Shaw Renewable Investments (DESRI) has closed on financing and started construction on its San Juan 1 project, a 200 MWac solar and 100 MWac battery storage facility adjacent to the former San Juan Generating Station in San Juan County, New Mexico. The project is a critical capacity replacement to the San Juan Generating Station,&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/d-e-shaw-construction-200-mwac-san-juan-solar-storage-project\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15608,442,1570,2906,9974,13648,16366,6457,14140],"class_list":["post-807594","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-d-e-shaw-renewable-investments","tag-energy-storage","tag-new-mexico","tag-news","tag-projects","tag-solarstorage","tag-solv-energy","tag-storage","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/807594","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=807594"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/807594\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=807594"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=807594"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=807594"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}