{"id":807814,"date":"2023-07-12T14:41:28","date_gmt":"2023-07-12T14:41:28","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=45717"},"modified":"2023-07-12T14:41:28","modified_gmt":"2023-07-12T14:41:28","slug":"meet-e-storage-canadian-solars-rebranded-utility-scale-storage-subsidiary","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/meet-e-storage-canadian-solars-rebranded-utility-scale-storage-subsidiary\/","title":{"rendered":"Meet e-STORAGE, Canadian Solar\u2019s rebranded utility-scale storage subsidiary"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Canadian Solar Inc.\u00a0announced the re-branding of CSI Energy Storage, which will now be known as e-STORAGE. This is CSI Solar\u2019s utility-scale battery energy storage subsidiary and platform. Canadian Solar says e-STORAGE will operate as a distinct business unit, under CSI Solar. e-STORAGE launches with nearly 26 GWh of energy storage projects in its total pipeline&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/meet-e-storage-canadian-solars-rebranded-utility-scale-storage-subsidiary\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[573,12961,2906,3000,6457,14140],"class_list":["post-807814","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-batteries","tag-canadian-solar","tag-news","tag-products","tag-storage","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/807814","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=807814"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/807814\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=807814"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=807814"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=807814"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}