{"id":810735,"date":"2023-07-27T18:53:19","date_gmt":"2023-07-27T18:53:19","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=45931"},"modified":"2023-07-27T18:53:19","modified_gmt":"2023-07-27T18:53:19","slug":"breaking-ferc-issues-final-rule-on-reforming-interconnection-process-for-renewable-energy","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/breaking-ferc-issues-final-rule-on-reforming-interconnection-process-for-renewable-energy\/","title":{"rendered":"BREAKING: FERC issues final rule on reforming interconnection process for renewable energy"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Federal Energy Regulatory Commission (FERC) issued a final rule today to improve the interconnection process and address the growing backlog of renewable energy projects \u2014 mostly wind, solar and storage resources \u2014 waiting in queues nationwide. FERC\u2019s historic ruling marks a step toward the modernization of the U.S. energy grid by streamlining the interconnection&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/ferc-issues-final-rule-on-reforming-interconnection-process\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[3282,12902,15215,2906,4366,9974],"class_list":["post-810735","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-acore","tag-ferc","tag-interconnection","tag-news","tag-policy","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/810735","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=810735"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/810735\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=810735"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=810735"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=810735"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}