{"id":811448,"date":"2023-07-31T12:47:16","date_gmt":"2023-07-31T12:47:16","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=45947"},"modified":"2023-07-31T12:47:16","modified_gmt":"2023-07-31T12:47:16","slug":"enphase-now-shipping-iq8-microinverters-from-second-u-s-based-facility","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/enphase-now-shipping-iq8-microinverters-from-second-u-s-based-facility\/","title":{"rendered":"Enphase now shipping IQ8 microinverters from second U.S.-based facility"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Earlier in July, Enphase Energy made a big splash when it started rolling out IQ8 Microinverters from a facility in Columbia, S.C., produced by global manufacturer Flex. This was the first production of Enphase product via contract manufacturing in the United States \u2014 a big enough deal that President Biden stopped by to make some&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/enphase-now-shipping-iq8-microinverters-from-second-u-s-based-facility\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[16286,12898,15367,12874,2906,3000,13095],"class_list":["post-811448","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-domestic","tag-enphase-energy","tag-inverters-and-ebos","tag-microinverters","tag-news","tag-products","tag-residential-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/811448","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=811448"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/811448\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=811448"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=811448"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=811448"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}