{"id":813378,"date":"2023-08-09T18:18:38","date_gmt":"2023-08-09T18:18:38","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=46083"},"modified":"2023-08-09T18:18:38","modified_gmt":"2023-08-09T18:18:38","slug":"new-community-solar-farm-a-first-for-socal-edison-under-ecr-program","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/new-community-solar-farm-a-first-for-socal-edison-under-ecr-program\/","title":{"rendered":"New community solar farm a first for SoCal Edison under ECR program"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The newly launched 3.8 MWdc Sheep Creek Community Solar Farm in Adelanto, California, marks the first project under California\u2019s\u00a0Enhanced Community Renewables (ECR) program\u00a0to be contracted by one of the state\u2019s three investor-owned utilities. As one of the first community solar farms in Southern California, Sheep Creek Community Solar Farm is designed to generate clean energy&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/new-community-solar-farm-a-first-for-socal-edison-under-ecr-program\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[69,57,9666],"tags":[14862,15757,811,2906,9974,1689,2846],"class_list":["post-813378","post","type-post","status-publish","format-standard","hentry","category-california-leed-projects","category-leed-news","category-solar-power-energy","tag-ampion","tag-catalyze","tag-community-solar","tag-news","tag-projects","tag-southern-california-edison","tag-sustainability"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/813378","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=813378"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/813378\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=813378"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=813378"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=813378"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}