{"id":813519,"date":"2023-08-10T15:19:05","date_gmt":"2023-08-10T15:19:05","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=46097"},"modified":"2023-08-10T15:19:05","modified_gmt":"2023-08-10T15:19:05","slug":"alliant-solar-energy-battery-projects-in-wisconsin-get-green-light","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/alliant-solar-energy-battery-projects-in-wisconsin-get-green-light\/","title":{"rendered":"Alliant solar energy battery projects in Wisconsin get green light"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Public Service Commission of Wisconsin (PSCW) approved two Alliant Energy battery energy storage projects totaling 175 MW. The PSCW approval clears the way for construction to begin on the 100 MW Grant County Battery Project and 75 MW Wood County Battery Project. They will be located alongside the company\u2019s\u00a0Grant County\u00a0and\u00a0Wood County\u00a0solar sites. The integration&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/alliant-solar-energy-battery-projects-in-wisconsin-get-green-light\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666,380],"tags":[13606,573,442,9974,6457,14140],"class_list":["post-813519","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","category-wisconsin","tag-alliant-energy","tag-batteries","tag-energy-storage","tag-projects","tag-storage","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/813519","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=813519"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/813519\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=813519"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=813519"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=813519"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}