{"id":813699,"date":"2023-08-11T14:44:11","date_gmt":"2023-08-11T14:44:11","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=46112"},"modified":"2023-08-11T14:44:11","modified_gmt":"2023-08-11T14:44:11","slug":"first-solars-fifth-u-s-solar-manufacturing-site-planned-for-louisiana","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/first-solars-fifth-u-s-solar-manufacturing-site-planned-for-louisiana\/","title":{"rendered":"First Solar\u2019s fifth U.S. solar manufacturing site planned for Louisiana"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>First Solar\u2019s expansion news keeps rolling right along. This week, the company selected the Acadiana Regional Airport in Iberia Parish, Louisiana, for its previously announced fifth vertically integrated manufacturing facility in the United States. The new Louisiana facility will produce First Solar\u2019s Series 7 modules. First Solar says the ~$1.1 billion facility will be the&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/first-solars-fifth-u-s-solar-manufacturing-site-planned-for-louisiana\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[16286,2189,2906,3000,5863],"class_list":["post-813699","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-domestic","tag-first-solar","tag-news","tag-products","tag-pv-modules"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/813699","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=813699"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/813699\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=813699"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=813699"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=813699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}